FeaturesGetting StartedFAQPricingBlogPrivacy PolicyTerms of Services

how to migrate from linear to overbooked

ÖE

Ömer Eker from ezier

November 27, 2026
linear alternativelinear migrationmigrate from linear+4 more
8 min read

Comments

Read Next Post
SupportPrivacy PolicyToSBlog

© 2026 Overbooked. All rights reserved.

SupportBlogPrivacy PolicyTerms of Services

© 2026 Overbooked. All rights reserved.

Made with ❤️ by Ezier

Switching from Linear? Bring your projects, issues, statuses, comments, milestones and docs into Overbooked without duplicates. Here's the full guide.

Let's get one thing out of the way: Linear is a great issue tracker. It's fast, it's opinionated in good ways, and keyboard-first teams love it. If an issue tracker is all you need, you may never need to leave.

But a lot of teams eventually notice that the issue tracker is only one of the tools they run their work in. This guide is for them. It covers why teams move from Linear to Overbooked, what migrates and how it maps, and how to switch without losing a single comment.

Why you should migrate from Linear

1. Your work isn't only issues

If you're an agency, a studio or a product team doing client work, your day also includes tracked hours, client approvals, meeting notes, proposals and invoices. In a Linear setup, each of those is another tool, and another place where "what did we actually ship for this client last month?" has to be reconstructed by hand.

Overbooked keeps tasks next to time tracking, clients, meetings, goals, docs and invoices. The task you closed and the hours you logged on it are in the same place as the invoice they end up on.

2. Coding agents that work from your tasks, with your team watching

In Overbooked you can start a coding agent (Claude Code, Codex or Cursor) straight from a task. The session is shared with your team by default, so anyone can watch it work, answer its questions, approve a command or send a follow-up. When it's done, you can open, review and merge the pull request from the same screen. And through MCP, any other agent you use can read and update your Overbooked workspace too. We cover all of that in our agents guide.

3. Slack threads that turn into tracked work

Mention @Overbooked in a mapped Slack channel and it can create or update tasks in that project, with a confirm button before anything changes. Task updates are posted back into the same thread. If your Linear projects were already tied to Slack channels, Overbooked can even inherit that mapping.

4. Docs, prototypes and context in one place

Your Linear documents and links come across as Overbooked resources, organized per project. Specs, research and decisions sit next to the work they describe, where both humans and AI can find them.

5. You can try it without switching off Linear

You don't have to commit on day one. Overbooked can keep importing from Linear while you test, or sync both ways while two teams use different tools. Pick the level of commitment you're comfortable with.

Before you start

  • Be an owner or manager in your Overbooked workspace. Only owners and managers can connect integrations.

  • Invite your teammates first, using the same emails they use in Linear. Linear assignees are matched to Overbooked members by email only. Anyone who isn't a member yet means their issues come in unassigned.

  • Know which projects matter. Linear workspaces tend to accumulate experiments. Migration is a nice excuse to leave some of them behind.

Step 1: Connect Linear

Go to Integrations and find the Linear card ("Sync issues"). Click Connect and approve access in Linear. Overbooked asks for read and write access: read so it can import, and write in case you later choose Two-way sync.

New to Overbooked? The onboarding flow has an Import your work step with an Atlassian / Linear switch, so you can connect Linear and import before you even see the dashboard. If you skip it, everything is still available from Integrations later.

Step 2: Select your Linear projects

The first dialog, Step 1 of 2 · Select Linear projects, lists your projects grouped by team. Search, tick what you want (or Select all), then Save selection.

Projects you create in Linear later stay unselected until you add them, so a continuous sync never quietly grows on you.

Step 3: Choose how Overbooked and Linear should relate

In Step 2 of 2 · Import from Linear, choose one of three modes:

  • One-time import: copy the selected projects and issues once. Nothing changes automatically afterwards. Best for a clean, dated cutover.

  • Keep importing from Linear: future Linear changes are applied in Overbooked, and Overbooked never writes back to Linear. Best for a trial or a gradual move.

  • Two-way sync: changes can update both systems. Title, description, priority, status and milestone can flow back to Linear, along with comments and documents/links. It's an explicit opt-in for a reason: edits on one side can overwrite the other.

Our take: most teams should run Keep importing for a sprint or two, then stop using Linear. Use Two-way sync when part of the company is staying on Linear for a while.

Step 4: Pick the docs and links you want

Issues and their comments are imported automatically. Linear documents and resource links are different: you choose them.

Under Project resources, click Preview project resources. You'll get a searchable picker of every document and link in the selected projects, with Select visible, Clear visible and per-project selection. That's handy when a project has a hundred stale meeting notes and five docs that actually matter.

Step 5: Import

Click Import selected projects. If you close the dialog mid-way, choose Keep importing in background and carry on with your day.

Large projects are imported in safe batches of roughly 2,000 issues per project per run. If you hit that limit, just run the import again: it continues where it left off. Re-running never creates duplicates, because everything imported remembers where it came from and gets updated instead.

What comes across, and how it maps

Projects

  • Each Linear project becomes an Overbooked project, with its name, description, link, start date and target date.

  • Project status maps sensibly: completed → live, canceled or paused → on hold, anything else → building.

  • Project milestones become milestones, and completed ones come in as completed.

Issues

  • The identifier is kept as the task ID. ENG-512 stays ENG-512, so links in PRs and commit messages still make sense.

  • Title and description come across.

  • Workflow states become custom statuses, with Linear's colours and order. Your board looks like home.

  • Priority maps to Overbooked's three levels: Urgent and High → high, Medium → medium, Low and No priority → low.

  • Labels: the first label on each issue is kept.

  • Assignees are matched by email.

  • Sub-issues become sub-tasks, and relations come across: "blocks" stays blocks, other relations become "related".

  • Archived issues stay archived.

Comments

Comments come across with their threaded replies intact. If an author isn't in your workspace, their Linear name is shown so you still know who said what.

Documents and links

The documents and links you selected land in a resources folder named after their project. Authors and collaborators are matched to members by email.

What doesn't come across

  • Cycles

  • Estimates and due dates

  • File attachments (images hosted on Linear come across as links)

  • Comments on documents

  • @mentions

  • Labels beyond the first one

If your team plans in cycles, this is a good moment to try milestones instead. They're visible on the project, and agents and teammates can see what each one contains.

Keeping things in sync

With Keep importing or Two-way sync, changes to issues, comments, documents and projects in Linear show up in Overbooked as they happen, and project details and milestones are re-checked regularly in case anything was missed.

When something can't sync, it isn't silently dropped. It appears in a Sync needs attention panel where you can Retry or Discard it. If Linear is rate-limiting a big import, you'll see "Linear is rate limiting imports. Try again later." If the connection expires, the card asks you to Reconnect.

A 30-minute migration plan

  1. Invite the team with their Linear emails.

  2. Connect Linear from Integrations.

  3. Select one real project and import with Keep importing.

  4. Check five things: statuses, assignees, a sub-issue, a long comment thread and a document.

  5. Import the rest, choosing documents and links per project.

  6. Map Slack channels to projects so mentions become tracked work.

  7. Set a cutover day and tell everyone that new work goes in Overbooked.

  8. Revoke the Linear connection when you no longer need it.

FAQ

Can I import Linear projects into an existing Overbooked project?

The importer creates a new Overbooked project for each Linear project you select. Re-running it updates those projects instead of creating new ones.

Will my issue IDs change?

No. Linear identifiers are kept as task IDs.

Does Two-way sync create Overbooked tasks in Linear?

No. Two-way sync keeps linked work in step: it pushes changes to issues and comments that came from Linear. A brand-new task created in Overbooked stays in Overbooked, so treat Overbooked as the home for anything new.

Is there a limit on how much I can import?

Each run handles about 2,000 issues per project. For bigger projects, run the import again and it continues.

Make the move

Head to Integrations, connect Linear and import your first project. If part of your company is on Jira and Confluence, our Atlassian migration guide covers that side.